Black Wire Backed PP Woven Silt Fence

Black Wire Backed PP Woven Silt Fence
Woven silt fence with integral wire support for demanding sites
- Fabric
- Woven PP, 100-120 g/m2
- Wire Backing
- Welded 14-12 gauge mesh
- Height
- 24-36 (0.6-0.9m)
- Flow Rate
- Filtered, sediment retaining
Product Description
Black wire backed PP woven silt fence pairs a dense woven filter weave with welded wire reinforcement, filtering runoff while withstanding heavy sediment loading and storm winds better than unsupported fabric. Pre-attached stakes and 30m rolls allow one crew to enclose large perimeters quickly. Meets common state DOT sediment control specs.
Full Specifications
| Fabric | Woven PP, 100-120 g/m2 |
|---|---|
| Wire Backing | Welded 14-12 gauge mesh |
| Height | 24-36 (0.6-0.9m) |
| Flow Rate | Filtered, sediment retaining |
| Roll | 30m with pre-attached stakes |
| Standard Packaging | Export cartons, pallets or coils suited to product type |
| Custom Options | OEM sizes, private-label packaging on request |
| Compliance | Manufactured under ISO 9001 quality system |
Key Features
System Supply
Fabric or mesh, posts, fittings and tools supplied together so fences go up without delays.
Heavy Zinc Protection
Class 1 to Class 3 hot-dip galvanizing options match project design life.
Wildlife & Stock Safe
Graduated spacing and smooth knuckles protect animals and installers alike.
Contractor Packaging
Long rolls and pre-cut lengths sized for crew productivity.
Applications
Perimeter Security
Farm & Ranch
Residential
Erosion Control
Frequently Asked Questions
What is the minimum order quantity?
MOQ varies by product, typically 50 rolls or panels; full container mixes are welcome for the best pricing.
Do you supply complete fence systems?
Yes, we quote fabric, posts, gates, barb, fittings and tools as a coordinated package.
Can you match national standards?
We manufacture to ASTM, EN and GB specifications and provide test reports on request.
What is the lead time?
Stocked fencing ships in 7-15 days; larger and custom orders take 20-30 days.


