Galvanized Double Loop Tie Wire

Galvanized Double Loop Tie Wire
Pre-formed double loop wire ties for rapid bagging and rebar binding
- Profile
- Double loop pre-formed tie
- Wire Diameter
- 1.0-3.0mm
- Loop Size
- 15-80mm, custom
- Finish
- Electro / hot-dipped galvanized
Product Description
Galvanized double loop tie wires are pre-formed with a loop at each end so a single twist of a tying tool closes the tie, multiplying binding speed on rebar, bags, cables and fencing. Zinc coating protects ties used in damp environments. Loop sizes and wire gauges can be tailored to the application.
Full Specifications
| Profile | Double loop pre-formed tie |
|---|---|
| Wire Diameter | 1.0-3.0mm |
| Loop Size | 15-80mm, custom |
| Finish | Electro / hot-dipped galvanized |
| Packing | Bundles or cartons |
| Standard Packaging | Export cartons, pallets or coils suited to product type |
| Custom Options | OEM sizes, private-label packaging on request |
| Compliance | Manufactured under ISO 9001 quality system |
Key Features
Certified Raw Material
Wire rod is sourced from certified mills with traceable chemistry and heat numbers.
Tight Tolerance Drawing
Multi-pass drawing holds diameter and ovality to strict tolerance for smooth processing.
Coating Options
Electro-galvanized, hot-dipped galvanized, PVC and painted finishes to match the service environment.
Production Coil Formats
Spools, small coils and 500kg+ big coils wound for trouble-free machine pay-off.
Applications
Wire Manufacturing
Construction
Mesh Weaving
Packing & Binding
Frequently Asked Questions
What is the minimum order quantity?
Standard MOQ is 2,000 kg; small trial quantities can be discussed for new customers.
Do you supply mill test certificates?
Yes, every consignment ships with a certificate of chemistry and mechanical properties on request.
Can coils be wound to our specification?
We wind to your required coil weight, inner diameter and traversed or ribbon format to suit your payoff equipment.
What is the lead time?
Stocked gauges ship in 7-15 days; custom drawing and coating runs take 20-30 days.


